homeindia NewsWatch: Railway Minister Ashwini Vaishnaw shares glimpse of the new Pamban Bridge

Watch: Railway Minister Ashwini Vaishnaw shares glimpse of the new Pamban Bridge

Nearly 84 percent of the work is completed on the new state-of-the-art Pamban Bridge, India’s first vertical lift railway sea bridge.

By CNBCTV18.com Dec 29, 2022 2:10:06 PM IST (Updated)

2 Min Read

Railway Minister Ashwini Vaishnaw has shared an animated video of the new Pamban Bridge, which will soon connect Rameswaram, a Municipality in Tamil Nadu, with the rest of India. The 26-second clip shows how the state-of-the-art bridge and its vertical lift will function, once it is ready for operations.
The video was shared by the Railway Minister on Wednesday, and it has garnered over 1 million views on Twitter. The video shows the functioning of India’s first vertical lift railway sea bridge.
 

The 72-metre-long Vertical lift span can be lifted up to 17 metres to allow ships to pass under it. The vertical lift span will be built for a double track and the bridge will have 100 spans across the sea. Out of the total spans, 99 spans will be 18.3 metres long and one span with the vertical lift will be 72.5 metres.